Monthly Archives: July 2017

Lift In 2017

At last, the harbour was ready and lift in took place on June 17.  Harbour master Al had jobs well organized and in spite of difficulties with high water, lift in went ahead with out a hitch.  Once the last boat was lifted in, a fine lunch of ham and scallop potatoes was served by

Read More

June 7 Work Session

Weather wise June 7 was a  perfect day to hold the second major work session to get the harbour usable in spite of high water level.  Member turn out was great and in no time all the docks were tied back to the anchor blocks that were placed the week before.  Phil, in his wisdom

Read More