Weather wise June 7 was a perfect day to hold the second major work session to get the harbour usable in spite of high water level. Member turn out was great and in no time all the docks were tied back to the anchor blocks that were placed the week before. Phil, in his wisdom opted to purchase gravel that could be installed with a rock slinger. The cost was slightly more but the amount of manual labour required was nil. See the pictures below and note instant gravel walkways. The harbour is now almost ready for lift in.